A software project test plan is a document that describes the objectives, scope, approach, and focus of a software testing effort. The process of preparing a test plan is a useful way to think through the efforts needed to validate the acceptability of a software product. The completed document will help people outside the test group understand the 'why' and 'how' of product validation. It should be thorough enough to be useful but not so thorough that no one outside the test group will read it. A test plan states what the items to be tested are, at what level they will be tested, what sequence they are to be tested in, how the test strategy will be applied to the testing of each item, and describes the test environment. A test plan should ideally be organisation wide, being applicable to all of an organisations software developments. The objective of each test plan is to provide a plan for verification, by testing the software, the software produced fulfils the functional or design statements of the appropriate software specification. In the case of acceptance testing and system testing, this generally means the Functional Specification. You
should begin the test plan as soon as possible. Generally it is
desirable to begin the master test plan as the same time the
Requirements documents and the Project Plan are being developed. Test planning can (and should) have an impact on the Project Plan. Even though plans that are written early will have to be changed during the course of the development and testing, but that is important, because it records the progress of the testing and helps planners become more proficient. What to consider for the Test Plan:1. Test Plan Identifier 2. References 3. Introduction 4. Test Items 5. Software Risk Issues 6. Features to be Tested 7. Features not to be Tested 8. Approach 9. Item Pass/Fail Criteria 10. Suspension Criteria and Resumption Requirements 11. Test Deliverables 12. Remaining Test Tasks 13. Environmental Needs 14. Staffing and Training Needs 15. Responsibilities 16. Schedule 17. Planning Risks and Contingencies 18. Approvals 19. Glossary Standards for Software Test Plans Several standards suggest what a test plan should contain, including the IEEE. The standards are:
SOFTWARE TESTING PROCESS PART THREE Article Source: http://www.ArticleBlast.com |
||
You are welcome to publish this article free of charge on your website, newsletter, or e-zine, provided:
- You don't change the article in any way
- You include the entire article, including the "about the author" box
- All hyperlinks must remain intact, including email addresses, and the link to ArticleBlast.com at the bottom
- In doing so you agree to indemnify the article's author, and ArticleBlast.com and its directors, officers, employees and agents from and against all losses, claims, damages and liabilities which arise out of its use
- It is also recommended that you provide a courtesy copy of your publication to the author of the article